Project: Fort Richardson Water Treatment Plant and Clearwell

Million Dollar Budget

Million Gallon Clearwell

Year Old Facility

Z

Services Provided by RBA

  • Design Review
  • Construction Inspections
  • Commissioning
  • Functional Testing
  • Owner Peace of Mind
Z

Project Features

  • 1.5 MG Welded Steel Tanks
  • Chlorination Building
  • Chemical Feed Systems
  • Raw Water Piping
  • In-line Mechanical Mixers
  • Hydroflurosilic Acid System
  • Instrumentation, Controls, and SCADA

Fort Richardson Water Treatment Plant and Clearwell Commissioning

 

Project Briefing

RBA is currently the Commissioning Agent for the renovation of the Fort Richardson Water Treatment Plant and the construction of a new 3.0 million gallon clearwell. The Water Treatment Plant was originally constructed in 1952 and most of the equipment is 60+ years old. RBA was brought on board early on in the project to do a thorough review of the design at each design completion phase, as well as perform commissioning services on the completed project.

Project Details

Client: Doyon Utilities, LLC

Year of Project: 2016+

Location of Project: Fort Richardson, Alaska

RBA is currently the Commissioning Agent for the renovation of the Fort Richardson Water Treatment Plant and the construction of a new 3.0 million gallon clearwell. The Water Treatment Plant was originally constructed in 1952 and most of the equipment is 60+ years old. The plant was designed to treat up to 7.5 million gallons per day, but currently it cannot meet water quality regulations at a rate greater than 3 million gallons per day.

This project consists of upgrading the raw water piping, the Chlorination Building, in-line mechanical mixers, chemical feed system, hydrofluorosilic acid system, instrumentation, controls, and SCADA. The new 3 million gallon clearwell will entail of two (2) 1.5 million gallon welded steal tanks.

RBA was brought on board early on in the project to do a thorough review of the design at the 35%, 65%, 95%, and 100% design completion levels. We have provided the designer of record (DOR) with supportive review comments that touch on important design criteria such as life safety, coordination of controls, and economic concerns, as well as operation & maintenance of the facility.