- Joint Mobility Complex, Eielson AFB
RBA Engineers, Inc. prepared the performance specifications
for this $21 million complex. Both design charrettes
and VE workshops were integral to the scope of work.
The site work related to relocation of overhead electrical
distribution and telephone service from the utilidor.
Special features of the building included secure Red
Comm and telecommunications with local area network
wiring. All of the parameters were listed using metric
values.
- FY-04 Dormitory, Eielson AFB
This dormitory is located just west of the FY 01 Dorm
and will be three floors, suitable for 96 airmen.
It uses a 4-person module, relying on the latest Air
Force Enlisted Design Guide, in metric units. The
total area is 3,200 sqm or 34,400 sf. RBA is responsible
for the mechanical and electrical performance specifications.
A special feature is the telecommunications, fiber
optic cabling and closed circuit television. The site
for the dorm is west of Wabash Avenue and north of
Tanana Road. Budgeted construction cost = $14.8 million.
- Replace Family Housing, Ft. Wainwright
RBA Engineers, Inc. (RBA) assisted the Corps of Engineers
in preparing the mechanical and electrical portions
of this Design/Build Specifications. The RFP documents
for this work were authored by RBA for the mechanical
and electrical disciplines. Our engineers attended
a forty-hour design charrette at Ft. Wainwright with
the user agency personnel. Value engineering was performed
to compare various mechanical system configurations
and electrical system options for an $18 million project.
- Family Housing, Eielson AFB & Elmendorf
AFB
For a thirty (30) unit project, the scope encompassed
demolition of five 8-plex units down to the existing
basements; reconstruction of five 6-plex MFH units;
move all utilities underground. The purpose of the
replacement was to improve the functional layout,
enhance quality of life for the occupants, and update
layouts, in compliance with current Air Force standards.
|

Fuel Cell Hangar

Base Composite Facility Eielson AFB

Navy Submarine Test Facility

Ready Munitions Facility Eielson AFB

NCO Club HVAC Upgrade, Eielson AFB

Water Treatment Plant Fort Richardson
|