- BIG LAKE TRAIL, Parks Highway,
Alaska
RBA engineered the bike trail lighting and the highway
intersection of the Parks Highway and Pittman-Schrock
Road.
- KOSINSKI BALLFIELDS & CHESTER CREEK
PARK, Anchorage, Alaska
RBA engineered the distribution system for vendors
to use during activities. The relocation of the electrical
equipment to accommodate rearrangement of the ballfields,
was a part of the scope of work. Previously, RBA Engineers
designed an electronic scoreboard for Mulcahy Park.
- ENSERCH PLAZA, Anchorage, Alaska
RBA Engineers provided mechanical/electrical design
for the open plaza next to Enserch Tower, now the
Atwood Building. Area lighting and drainage was designed
to upgrade the site.
- CHESTER CREEK LOAD CENTERS, Anchorage,
Alaska
Various thaw wires and load centers were provided
for this Public Works project, involving an underpass
for "C" Street.
- TOWN SQUARE & 4TH AVE WALKWAYS,
Anchorage, Alaska
Electrical design and pedestrian amenities for the
4th Avenue Mall Project. Design services included
double level lighting, signage, and traffic control.
The specific location of the project was between 4th
and 5th Avenues, C St. to M St.
- RABBIT CREEK PARK PEDESTRIAN ILLUMINATION,
Anchorage, Alaska
Design and CA for a trail lighting project. The project
consisted of the design for illumination, power distribution,
and load center for approximately 1,000 feet of trail
located in South Anchorage.
- C STREET EXTENSION LIGHTING, Anchorage,
Alaska,
Design of illumination along existing and proposed
roadway, and at the intersection with International
Airport Road and Potter Drive. Extends from Alaska
Railroad crossing to Tudor Road.
- SPENARD ROAD WIDENING AND STREET ILLUMINATION
PROJECT, Municipality of Anchorage
Electrical engineering was provided for street illumination
for Spenard Road from Minnesota to Jewel Lake Road.
|

Hillside Trail Head

Kincaid Park Ski Hut

ARRC Ship Creek Plaza

MOA Four Parks Lighting

Kenai Russian River Access

Ship Creek Pedestrian Bridge
|