- Alaska Railroad Corporation Line Changes
This $40 million development is finally constructed.
Phase I primarily completed the track realignment
on Elemendorf ABF and RBA engineered 35kV and 15kV
power line relocations. Phase II covered sections
on Fort Richardson. Nearly 10 miles of fiber optic
cable in a duct bank as installed.
Starting in 2007, RBA will be working on the mechanical
and electrical support for the $300 million Port MacKenzie
Spur Line.
- Asplund Headworks
RBA is providing the mechanical design for the upgrade
of the HVAC and ventilation systems as a follow-up
to the 1999-2001 work in Anchorage's Wastewater Treatment
Facility.
- Asplund Water Treatment Plant
The mechanical and electrical upgrades at Pt. Woronzof
included a boiler replacement, lab air conditioning
modifications and improvement of controls. RBA was
a sub-consultant on the Asplund Facilities Plan, 1999
and the subsequent Solids Improvements design, 2001.
- 35kV Power Distribution City of Unalaska
For two roadways, Ballyhoo and East Point, RBA is
providing 35kV power distribution upgrades. The cost
estimate totals $2 million and encompasses sectionalizers,
transformers, underground conduit and some 480V distribution.
- South Channel Bridge
This bridge crossing over Captain's Bay is 700 feet
long. RBA's scope of work spans roadway lighting,
35KV power crossing, telephone and cable distribution
conduits across the waterway. The piers and bridgework
will have US Coast Guard dictated navigational lights
- Fort Richardson Water Treatment Plant
RBA supervised the field construction of this plant.
The firm oversaw work of subcontractors, maintained
submittal logs, conducted inspections, prepared as-builts,
and completed the final project close-out.
- AWWU PS#31 Generator
Ed Bass, PE was responsible for designing the standby
generator at Pump Station #31. He completed this project
for AWWU in 1998; construction cost estimate was $175,000
for a 200kW oil-fired generator. The actual work replaced
an underground tank with an above-ground, double-wall
tank on the site and also at six other locations.
- USAF Long Range Radar Stations,
RBA designed the lagoon pump stations for the remote
facilities in Indian Mountain, Spaarvohn and Fort
Yukon
- South Anchorage Middle School
A 16" diameter pipeline, with two pump stations,
SCADA controls and storage tank of 500,000 gallons,
was designed for the Anchorage School District under
AWWU guidelines.
- King Salmon Sewer, Phases I, IIA, IIb,
IIC
RBA designed the seven lift stations, load centers
and controls for this rural wastewater system. For
the above-ground sections, heat tape freeze-protection
was designed. The entire project was built in several
phases based on funding.
|

AWWU Two Septage Stations

Mapco Express

Mountain View Community Center

Elfin Cove Tank Farm

Sealife Center Pump Station

Midway Power Plant

Midway Fuel Tank Fabrication

50,000 Gallon Fuel Tank

Electrical Lugs on Live 480V Bus

450 kW Generator Panel
|